In support of our Registration of Interest, we submit below details of recent projects and relevant projects completed in the past 10 years.

 

Please enjoy looking through some of our latest projects by simply clicking on the images.

Mt Richmond School

Window Joinery / ACM Exterior Cladding Replacement Removal of existing old wooden joinery. Installation of insulation to wall cavities. Installation of new commercial grade powdered coated aluminium joinery. Installation of new fibre cement wall cladding to exterior walls that are being affected. Make good all areas where new wall cladding meets existing cladding that is…

Details

Windy Ridge School

Replace wooden front doors with Aluminium doors on 4 classrooms Replace rear doors on 4 classrooms with double opening doors Replace windows in one classroom with aluminium frames Upgrade lighting in one classroom to LED lighting Remove redundant heating pipes and celling fans and make good walls and ceilings Supply and install cover over the…

Details

Pakuranga Heights School – Block 3

Project Scope – Pakuranga Heights School – Block 3   Work to include removal of all doors and windows of North and South faces, to be replaced with aluminium units. This will allow better access and observation to the front courtyard. The toilet areas are to be gutted and the calling and wall linings to…

Details

Bairds Mainfreight Primary School

  Project Scope – Bairds Mainfreight Primary School   The board of Trustees of Bairds Mainfreight Primary School (the buyer) was seeking work to be carried out for toilets upgrade.  Project start date: February 2022 Date of completion:  August 2022 Total Project Value: $ 810,000  

Details

Opaheke School

Project Scope – Opaheke School   The current classroom block consisting of 4 classrooms is old including double corridors. The classrooms are all separated and not an ideal environment for ILE purposes.  Floor and lighting require replacement. Replace current exterior East side windows with Bi fold doors to allow better access to the exterior. Replace…

Details

St Leonards

Project Scope – St Leonard’s Primary School   To refurbish the existing Blocks 1 & 3 toilets where the  internal areas have been damaged due to water leaks through the existing roof. Block 2 toilets and breakout areas are to be upgraded to provide an integrated area for the students to have updated toilet facilities and…

Details

Orewa Childcare Facility

Project Scope – Orewa Childcare Facility on Sunny Heights Road in Orewa. The centre will cater for a maximum of 100 children and about 17 staff in an area of significant residential growth.   Cut and fill to site Install piles for retaining walls and building Install new drainage and tanks Install new slab Construction of new…

Details

Mellons Bay School

Project Scope – Mellons Bay School, The main works is to demolish two internal corridor walls and install new beams to carry the roof load. This will create a larger open plan teaching space for two classrooms. Doors and windows within the block will be replaced with new aluminium units, and there will be some…

Details

Riverina School

  Project Scope -This is Riverina School this is a refurbishment of 5 classrooms that will be used as a open learning space. Installation of new carpets wall linings heat pumps and new doors and windows. Project start date: October 2021 Date of completion:  December 2021 Total Project Value: $235,000    

Details

Alfriston School

Project Scope – The refurbishment of 2 classrooms and instillation of a new kitchen. Autex throughout , new floor coverings.   Project start date: July 2021 Date of completion: October 2021 Total Project Value: $120,000

Details