In support of our Registration of Interest, we submit below details of recent projects and relevant projects completed in the past 10 years.

 

Please enjoy looking through some of our latest projects by simply clicking on the images.

Bayswater School

Block 2 ILE & DQLS Upgrade AMS Combined Scope of project:   To deliver an ILE and DQLS upgrade to the two classrooms and wet area of Block 2. Works include the replacement of wall coverings, floor coverings, ceiling insulation, LED lights, and switchboard. The ILE portion of works will also include new interior aluminium…

Details

Edgewater College

  Project involves the modernization and interior refurbishment of the science block Project start date: September 2023   Before Photos!

Details

Manurewa High School

The scope of this project includes: Replace the internal wall linings. Blocks A, B, C, and D (known to the school as A Block) as they have reached end-of-life, requiring replacement.  The rooms that are included in the scope are: Downstairs – A15, A16, A17, A18, A19, TPT Room Upstairs – A1, A2, A3, A4,…

Details

Bairds Mainfreight

The Contract Works required are: Supply and install new acoustic rated carpet tiles and new vinyl to 6 Teachings Spaces.  Supply and install new acoustic composition board to walls to 6 Teachings Spaces. Remove the existing windows on the veranda side of the 6 classrooms and install double sliding aluminium doors into the existing openings…

Details

Three Kings Primary School

. The Contract Works required are: i. Demolition ii. Supply and installation of new framing iii. Supply and installation of new windows and doors iv. Supply and installation of new insulation v. Supply and installation of new wall, roof, and ceiling linings vi. Supply and installation of new inbuilt seating and cabinetry vii. Supply and…

Details

Torbay School – Garden to Table Project

This project requires the construction of a raised planters staggered for easy access for the pupils. Steps will also be built. What is Garden to Table? An exciting, integrated and comprehensive programme that helps children understand how to grow, harvest, prepare and share good food It builds skills for life through highly practical, curriculum-integrated and child-centric classes teaching…

Details

Sunnyhills School

The construction work at Sunnyhills School has been split into two projects. The works included are as follows: Lifecycle Replacements: Nature of the works is mainly interior replacement works to modernize current teaching spaces. Acoustic wall, carpet and vinyl flooring replacements. Replace lighting for new LED light units. Install heat pumps to replace redundant radiator…

Details

Panama Road School

The contract works required are: Classrooms Remove and dispose of carpet, supply and install of new 16oz direct carpet stick carpet tiles. Remove and dispose of the existing hessian wallcoverings. Supply and install new 10mm composite acoustic wall coverings. Existing exposed cables to be concealed behind the wall linings. Remove and dispose of the existing…

Details

Willow Park Primary School

The contract works required are: Remove and dispose of the existing window joinery units. Supply and install new aluminium commercial grade (40mm) window units to match existing. Inspect and repair timber surrounds Supply and install new window hardware to match existing (stays, hooks, locks & Latches) Make good to any damaged areas and after the…

Details

Edendale Primary School

The contract works required are: The construction works will include demolition, and redevelopment/modernization of the spaces as follows: Block 1 – rooms 22-27  Remove existing carpet tiles and replace with new carpet tiles. Remove carpet in the corridor outside room 27 by the student toilets and replace with new vinyl flooring. Remove existing wall coverings…

Details