Scope

F Block raised walkway bridge including new upper level interior access. Ground floor concrete paving and steps with new storm water drainage system; C-D Block Access works; Pavilion Building Access Lift with new concrete ramp and stairs including a new timber deck and balustrade to Pavilion building.

Architect: Architects h+k

Contract Value: $1,145,961.84